Covering ME1, ME2, ME3, ME4, ME5, ME7, ME8 postcodes

Solar and battery installers in Medway

Tell us about your solar or battery project in Rochester, Strood, Chatham or anywhere else in Medway. We pass it to vetted local solar and battery installers, and they quote you directly. Nothing is booked until you accept.

Solar and battery installer requests from Medway

Medway runs from historic Rochester and Chatham's terraces to the 1960s to 1980s estates of Walderslade, Lordswood and Rainham and newer homes around Hoo. Batteries, full rooftop systems and driveway EV chargers are all frequent requests. We'll pass yours to MCS-certified solar and battery installers covering ME1, ME2, ME3, ME4, ME5, ME7 and ME8.

  • Historic Rochester has been a conservation area since 1972, so check panel positions with Medway Council if your house is there.
  • Estate homes in Walderslade, Lordswood and Rainham often have driveways, which makes adding an EV charger more straightforward.
  • Medway Council is a unitary authority, so it handles both planning and highways questions across the area.

Solar in and around Historic Rochester

The Historic Rochester Conservation Area, designated in 1972, covers the High Street, the streets around the cathedral and castle, and many older terraces nearby. Within a conservation area, permitted development still allows panels on many roofs, but not on a wall, balcony or roof enclosure that fronts a highway, and listed buildings need consent. Medway Council has published an appraisal and management plan for the area, which is worth reading before you choose a layout. Rear roof slopes hidden from the street are usually the simplest route. If in doubt, ask Medway Council's planning team before ordering, and ask installers about all-black panels and neat edge trims.

Estate homes and EV charging in Walderslade, Lordswood and Rainham

Many homes in Walderslade, Lordswood and Rainham date from the 1960s to the 1980s, with simple gable roofs, concrete interlocking tiles and driveways or garages. That often makes them straightforward for solar, a battery in the garage and an EV charger on the side wall. Some estates have open-plan front gardens or covenants that restrict changes, so check your deeds. Older consumer units may need upgrading before new circuits are added, which installers should flag at survey. If your car is parked on the road rather than a driveway, ask Medway Council about the rules for on-street charging rather than running a cable across the pavement.

Towns and villages covered

RochesterStroodChathamGillinghamRainhamWaldersladeHooLordswood

Postcodes: ME1, ME2, ME3, ME4, ME5, ME7, ME8

Services in Medway

Solar panels with battery storage

Details

Adding a battery to existing solar panels

Details

Commercial, farm and outbuilding solar

Details

Solar repairs, inverter replacement and maintenance

Details

Nearby areas

Guides for Medway homeowners

FAQs

Solar and battery installer questions from Medway

Can I have solar panels on a house in Rochester's conservation area?

Often, on roof slopes that don't front the road. Panels can't go on a wall, balcony or roof enclosure facing a highway in a conservation area, and listed buildings need consent. Check with Medway Council first.

Do you cover Hoo, Strood and Gillingham?

Yes. All of Medway is covered, including Hoo, Strood, Chatham, Gillingham, Rainham, Walderslade and Lordswood.

Will my old fuse box need replacing for solar or an EV charger?

Possibly. Older consumer units sometimes need upgrading before new circuits can be added. An installer will check at the survey and explain why if it's needed.

A survey and quote before you commit

Need a solar and battery installer in Medway? Get your quote

Tell us about your property, your roof and what you'd like to achieve. Local MCS-certified installers come back to you, and nothing is booked until you accept.

Get a quote